+27 (0)21 510 1951info@theconstructionco.co.za
The Construction Co.The Construction Co.
The Construction Co.
Redecoration Renovation Refurbishment
  • Home
  • About Us
  • Projects
  • Services
  • BBBEE
  • Health & Safety
  • Contact Us
  • Home
  • About Us
  • Projects
  • Services
  • BBBEE
  • Health & Safety
  • Contact Us

DHA Cowrie

Project Outline

Project Location – Port of Cape Town, Cape Town Harbour, Cape Town

Project Timeline – 4 Months

About This Project

This was an accelerated project where an 8 month programme was successfully condensed into 4 months.

This project included the amalgamation of various national State Departments into one building, Cowrie Place. This project was the prototype for similar amalgamation of various State services from different areas within a precinct into one all-inclusive building. This was a prototype for the roll-out of similar amalgamations at all Ports in South Africa. The success of this project ensured the continuation of the roll-out.

The demolition of the old building to its core brick work superstructure included technical and health & safety challenges. The removal of the old asbestos roof and roof substructure required the implementation of hazardous material protocols while the reconfiguration of the existing building required extensive and in depth planning to accommodate a wide array of trades.

Back To Projects Page

Get In Touch

Our Address:
The Construction Co.
47 Burton Street, Maitland, Cape Town, South Africa.

Email: info@theconstructionco.co.za

Call us:
Tel: +27 (0)21 510 1951
Fax: 086 695 3226

Geo Location
-33.923448
18.482017

Quick Navigation
  • Home
  • About Us
  • Projects
  • Services
  • BBBEE
  • Health & Safety
  • Contact Us
24°C
Wind: 32km/h NW
Broken Clouds
Humidity: 60%
Cape Town
South Africa
Sat
22°C
Sun
23°C
Mon
23°C
The Construction Co.